Production Workshop Show

Take A LED Manufacture Tour In Radiance Now Without Hassle

Enjoy the Journey of An LED Light From Parts to Product

Our Radiance has dedicated workshops. Let’s learn how Radiance manage the whole manufacturing process of LED light and complete your order on budget and on time, batch after batch.

The Four Majors Processes

Raw Material Preparation

SMT Core Assembly 

LED Lights Assembly 

Testing & Packing

01

Step

Raw Material Preparation

When the production department receives the production order, the OA system will automatically generate the corresponding material preparation plan and notify the warehouse at the same time. The warehouse will prepare materials according to the production order, and then send and hand over the materials corresponding to the production workshop.

02

Step

SMT Core Assembly 

The heart of led light performance

The DOB SMD board is the all-in-one design of light source and power supply, which determines how it can be dimmed, how many LEDs we can use, operating voltage, and many other key specifications. The design ideas all build in Radiance. At the same time, the manufacture of DOB patch boards is strict. Our workers need to put all the electronic components into the high-speed SMT production line according to the design. The operator will operate the corresponding assembly procedures, and then conduct repeated functional tests to ensure the normal operation of the LED DOB patch board. .

03

Step

LED Lights Assembly 

Assembling all the parts

With DOB SMD Board, accessories and housing prepared, the assembly workshop is here for joining all the parts together.

Radiance follows standardized assembly process with the help of BOM sheet for each mode of LED light, indicating the correct way and standard to assemble the light. All workers must finish the assembly job as per the sheet

Testing and Packaging

The assembled lights will be subject to a 30mins aging test. 4 automatic high and low pressure pressure impact aging shelf and with 100% products aging rate,Only when the lights pass the test will them be sent to the packaging lines..

04

Step

Radiance‘s Production Datas

1 +
Quality Inspector
1 Pcs
Lights Made Per Month
1 +
QC and production equipment
1 Years
OEM/ODM Experience​

Lean Manufacturing Management By 5s Principle

In Radiance daily work, we beenefits to be derived from implementing a lean 5S program include:

● Improved safety
● Higher equipment availability
● Lower defect rates
● Reduced costs
● Increased production agility and flexibility
● Improved employee morale
● Better asset utilization
● Enhanced enterprise image to customers, suppliers, employees, and management

Leave Your Idea To Us ...

Feel free to contact us or just drop a line here. Our support stuff will reach you very soon

Contact Us

Leave your details and one of our experts will contact you!

*We respect your confidentiality and all information are protected.

Factory In China
Official Contact
Follow Us

Request A Quote in right now

Request A Quote in right now